home / fishbowl_archive / rmaitem

rmaitem: 9

This data as json

id crossShipFlag dateResolved issueId lineNum note productId productSubId qty resolutionId returnFlag rmaId shipFlag typeId uomId vendorId vendorRMA
9 _binary   3 1 PO indicated REV 5 and Innofiber built to the drawing provided by the customer which was REV 2. We will also perform a FAI Report that should have went with the cable when shipping. Disposition Notes : FAI Report will be generated to perform the inspection of the cables. Because the cables were built to te wrong revision Innfobier will rebuild the cable at the correct revision. Immediate Correction: Build cable to REV 5 and perform FAI Report. Proposed Preventive Action: The customer did not provide a REV 5 drawing when placing the PO. A NC will be opened to review the process. 91226   1.0   _binary 9 _binary 10 1    
Powered by Datasette · Queries took 1.927ms